Provincial Trunk Highway 23 Reconstruction




KGS Group was retained by Manitoba Transportation and Infrastructure to administer the bituminous reconstruction of 27.6 kilometres of Provincial Trunk Highway 23, from the west junction of Provincial Trunk Highways 18 to 5. Connecting the province to the Town of Ninette and Pelican Lake, this renewal fulfills the Manitoba Transportation and Infrastructure’s mission to ensure safe, reliable and sustainable infrastructure and services for Manitoba and its communities.
Throughout the project we monitored traffic management and contractor operations, tracked quantities, handled change requests, performed density testing, surveyed for quantity calculations and design geometry and coordinated material sampling for laboratory testing. The result is a durable, smoother roadway with improved safety and drainage that will connect the communities for years to come.
Project Highlights
- Reconstruction of 27.6 km of Provincial Trunk Highway 23
- Culvert extensions to improve drainage and accommodate new roadway sections
- Pulverization of existing pavement and base course to prepare for reconstruction
- Placement of additional base course to restore structural capacity
- Guardrail installation at priority locations for enhanced roadside safety