Brady Road Resource Management Facility Road Renewals

City of Winnipeg
Location Pin
Winnipeg, Manitoba

KGS Group was retained by the City of Winnipeg for preliminary design, detailed design and contract administration services to complete the asphalt reconstructions of Charette Road and Payette Road. This project included 2,590 metres of 2-lane asphalt roadway with improved ditch drainage, French drain cutoffs and culvert installations within the Brady Road Resource Management Facility.

Our designs included a robust pavement structure, drainage improvements (ditch cleanout, grading, French drains and culvert replacement), utility relocations (underground plant and pole structure relocations) and improved geometry assessed through vehicular swept-path analysis. In addition to this, we provided a comprehensive traffic management plan to ensure continual use of the facility during construction.

The result is a permanent, heavy-duty driving surface for residential, commercial and operational users to safely access the Brady Road Resource Management Facility.

Expertise

Transportation

Learn More

Project Highlights

  • Preliminary design, detailed design and contract administration services to complete the asphalt reconstructions of Charette Road and Payette Road
  • Coordination with agencies, utilities and Manitoba Hydro
  • The reconstructed roads reduced dust and mud issues, while extending the road life under heavy loads
  • The design included ditch drainage improvements, utility relocations and improved geometry of the road