Proof of Possibility: The Husky Ethanol Story

You wouldn’t expect the story of building two ethanol plants in rural western Canada to begin in Spain, but you’d be surprised. 

Back in 2004, one of the four KGS founders, Helmut Graumann, took a long look at the future of KGS Group’s industrial practice during his trip to the land of the setting sun.  

KGS had recently landed a contract to conduct a feasibility study for a major ethanol plant project with Husky Energy. Helmut, and senior mechanical engineer Richard Wisniewski, travelled to the Spanish region of Galicia to tour a newly completed ethanol facility designed by process consultant Katzen International. This plant employed wheat as a feedstock rather than the more typical corn feedstock, similar to the plant that Husky had retained KGS to work on. 

The point of the visit? Help the team better understand the type of project they were about to undertake. 

As they approached the facility, Helmut remembers asking which portion of the sprawling complex was the ethanol plant. 

The answer was simple. 

“All of it.” 

Suddenly, the scale of the challenge ahead of them became real. 

KGS was originally brought on to conduct a study focused on the requirements of expanding the Minnedosa plant.

The original study focused on what was required to expand a small outdated existing ethanol facility in Minnedosa, Manitoba. The work was thorough and comprehensive. It showed Husky that KGS understood both the technical challenges and the broader business objectives. That trust proved to be invaluable. 

KGS now had to deliver a large-scale ethanol facility in Lloydminster, Alberta. 

For many companies, a leap of this magnitude would have seemed impossible. But KGS had a history of facing the unknown and coming out stronger. 

Most projects KGS was responsible for at the time were a fraction of the size of the ethanol plant in Lloydminster. It represented roughly $200 million in construction value. 

“We knew this was going to be the biggest project that Industrial had ever worked on,” Hugh Williams, Vice President—Buildings & Spaces and Industrial recalls. “We knew we were up against something big, and it was a little scary.” 

The challenge wasn’t a lack of capability. KGS had extensive experience designing structures, utilities, mechanical systems and industrial infrastructure. The challenge was twofold.  

  1. Ethanol production required expertise and resources that KGS did not yet have 
  1. The sheer scale and complexity of the project elements brought together in a major chemical processing facility. 

KGS had to expand rapidly. Helmut assembled a team of specialists from around the world, mostly contract personnel, and partnered with process engineers who understood the intricacies of ethanol production. At the same time, KGS focused on what it did best: integrating complex facilities into real-world environments through multidisciplinary engineering, infrastructure design, utilities, structures, buildings and site development.  

The project accelerated KGS’s adoption of technologies and workflows now commonplace throughout the engineering industry. Large-scale 3D modelling became essential for coordinating several thousands of metres of piping, structural and electrical components and process equipment.  

Digital model of the plant superimposed on the site.

Like any pioneering effort, the learning curve was steep. 

The Lloydminster facility challenged everyone involved. Aggressive schedules, evolving client expectations and the realities of executing a project of unprecedented scale tested both the project team and the organization.  

But perhaps the most defining moment was yet to come. 

The Lloydminster facility was an unprecedented challenge for everyone involved.

Despite good progress, KGS was temporarily removed from the project due to external pressures within Husky, favouring a local engineering presence. The project team thought their efforts were in vain. After months of time and investment, they were suddenly asked to put their pencils down.  

But fate would be on KGS’s side once again. 

Progress by KGS’s replacement did not meet the client’s expectation, and ultimately the project returned to KGS’s control. The client trusted the people who had already proven they could deliver, and KGS continued to prove why that was the right choice.  

When the Lloydminster plant was complete two years later, KGS Group was asked to do it all again. An “almost exact” copy, but this time in Minnedosa, to replace the small (one tenth the size) outdated ethanol facility.  

The Minnedosa project benefited from lessons learned on Lloydminster and was delivered with efficiency and effectiveness that showed how far the team had come in a short time. According to Helmut, “when the client flipped the switch after the equipment and systems were commissioned, the facility started up remarkably smoothly, reaching full operational capacity within weeks.” 

The Minnedosa plant during construction required major equipment.

Perhaps more important than the projects themselves were what they left behind. 

The ethanol facilities fundamentally changed KGS’s industrial practice. The experience expanded technical capabilities, strengthened project delivery systems and provided the confidence needed to pursue even larger opportunities. Projects for clients such as Mosaic and HyLife followed, supported by the knowledge, processes and people developed during the ethanol plant years. 

Many of the professionals who helped deliver those projects remain with KGS today, continuing to contribute to major industrial developments across Canada. 

Looking back, Helmut sees the projects as an example of what KGS has done repeatedly throughout its history: embracing opportunities that push the company beyond its comfort zone. 

“Every successful organization encounters moments when it must choose between staying within familiar territory or taking on a challenge that demands growth. For KGS, the Husky ethanol projects represented one of those moments. The work required new skills, new approaches and a willingness to learn along the way,” says Helmut 

By the time the plants were complete, the company had gained far more than two successful projects. 

It had gained the experience, confidence and capability to pursue opportunities that once seemed out of reach. 

As Demetrios Kontzamanis remarked while touring the completed facility, “If we can do something like this, we can go to the moon.” 

For KGS, those projects proved exactly that. They proved something that continues to define KGS today: when faced with a challenge larger than the company itself, the answer isn’t to step back. 

It’s to grow into it. 

Choosing Geothermal for KGS Place

When the cooling system at KGS Place, our home office at 865 Waverley, reached the end of its service life, we faced a decision many building owners encounter: replace the existing equipment or invest in a solution better suited for the future.

As engineers who regularly help clients evaluate sustainable building solutions, we approached the challenge the same way we would for any project. We explored the available options, assessed the costs and benefits and followed the data.

The results surprised even us.

While a traditional chiller replacement initially appeared to be the preferred option, our feasibility studies revealed that a full retrofit to an open-loop groundwater cooling system could be achieved for a comparable, and potentially lower, capital cost. At the same time, it offered significant long-term advantages for the building.

The upgrade provides:

  • Reduced operating costs
  • Lower maintenance requirements
  • Improved system reliability
  • Extended HVAC system life
  • Reduced environmental impact

For us, this project represents more than a successful retrofit. It demonstrates the confidence we have in the solutions we design and recommend for our clients. By applying the same engineering rigor to our own facility, we confirmed that the geothermal-based solution was the right choice for KGS Place.

When it came time to modernize our own building, we chose geothermal because we believed it was the best solution.

Watch the video below for a closer look at the project and the technology behind the system.

Lac Seul: Building Trust, One Bay at a Time

It was the winter of 1990 when Rob Kenyon travelled to Lac Seul, and KGS Group was still making a name for itself.

For Rob, hired the winter prior as Senior Geotechnical Engineer, working on large projects felt familiar. For KGS Group, it was an opportunity for a small, recently established firm to showcase its capabilities to the world.

Man standing in front of dam under construction
Rob Kenyon at the Lac Seul Dam construction site, 1990

The Lac Seul Dam, part of the Ear Falls Generating Station, is a powerhouse and headworks dam and spillway control structure on the Winnipeg River system. It was jointly administered by Ontario Hydro (now Ontario Power Generation), Manitoba Hydro, Winnipeg Hydro (later merged with Manitoba Hydro), Ontario Ministry of Natural Resources and Ontario Ministry of Transportation.

The structure, built in the 1930s, was declining due to time and the environment. The dam’s deck was a highway crossing up to the mid 1980s, and years of roadway salt exposure had deteriorated its concrete.

The rehabilitation of the structure required solid engineering expertise, careful planning and effective control of the construction work. “We had to take off the road deck, and we were mapping and demolishing the weathered and salt-affected concrete,” said Rob, who served as the Resident Engineer for the project execution. “Pier by pier, bay by bay.”

Lac Seul dam under construction
Typical pier surface demolition using Case 40 backhoe

Twenty bays to be exact, eight for the powerhouse intake and 12 for the spillway structure, each roughly 75 feet tall. Each bay was assessed, repaired and rebuilt, all while keeping the dam in service. A maximum of four spillway bays could be taken out of service at a time to enable Ontario Hydro and the Lake of the Woods Control Board to maintain spillway capacity. Something that required careful sequencing, robust temporary works and absolute confidence in design.

The temporary works at the intake and west abutment gravity dam, one of the project’s most effective solutions, were conceived by Helmut Graumann and former KGS employee, Jim Wedgewood.

Dam under construction
Pier 10 forming complete

“They employed a simple moveable cofferdam system that isolated individual bays,” notes Rob. “Once put in place, water pressure sealed the system against the concrete face and piers, allowing crews to work in the dry, demolish weathered concrete surfaces, and rebuild structural elements. The intake work also included supply of new sectional bulkhead gates designed by Demetrios Kontzamanis.

Dam under construction
Intake pier repair activities, Unit 1 and 3

Rob recalls that spillway pier repairs were completed behind existing spillway stoplogs, including pier reconstruction, upgrading of stoplog guides and sill beams, and anchoring of the spillway base slabs. Earlier chemical grouting of the foundation, designed and directed by Bert Smith had minimized seepage through the headworks foundations.

Our Founders designed and tendered this project the year before Rob got involved. The entire KGS team, consisting of six engineers and support staff at the time, was overjoyed when they were awarded the project in 1987 after being up against the five largest hydropower consultants in Canada. Their expertise and confidence paid off; the project proceeded with few surprises, on time and on budget, a rare outcome for a project of this scale and complexity.

For Rob, the experience reinforced the importance of clear design thinking and adaptability in the field. “We didn’t go in knowing all the answers,” he recalls, “but we knew we could figure them out. I could work without fear, because I knew the team was supporting me.”

When the project was completed, its impact on KGS Group extended beyond the project timeline itself. It provided financial stability for a young company just starting out, credibility and proof that we could deliver a major project for a reputable client. Our work on this project led to further dam rehabilitation and hydroelectric work across the country. It also established our relationship with several major hydro utilities, which remain amongst our largest clients today.

Nearly four decades later, the work done on Lac Seul stands as one of our foundational achievements. It has withstood the test of time, as a project that helped shape how we approach complex engineering work on high-risk infrastructure. While a relatively small project compared to today’s standards, Lac Seul set a trajectory in motion that, only a few years later, would see those same engineers called upon to protect entire communities from flooding at an unprecedented scale.

That story begins downstream.