Seine Riverbank Stabilization at the Branch 1 Aqueduct

City of Winnipeg
Location Pin
Winnipeg, Manitoba

Riverbank movements near the Seine River crossing threatened the City of Winnipeg’s 100‑year‑old Branch 1 Aqueduct, which carries 40% of the city’s drinking water. KGS Group helped stabilize the riverbank while keeping the aqueduct in service throughout construction, protecting a critical supply and reducing risk to the community.

Our team applied an extensive design evaluation process, a full-scale field-testing program, a ground-breaking instrumentation monitoring program and a highly prescriptive construction methodology to manage risk at each stage of construction.

This approach required more intensive engineering but reduced the construction timeline by one full year and resulted in significant project cost savings. After the stabilization work was completed, a complete revegetation project ensued, ensuring the area was ready for community use for years to come.

Expertise

Infrastructure and Water Management

Learn More

Project Highlights

  • Planning, design, geotechnical evaluation, construction oversight, monitoring and stakeholder coordination
  • Advanced instrumentation program and prescriptive construction sequencing
  • Project timeline was completed one year ahead of schedule, leading to significant cost savings
  • The site was restored and revegetated, improving the public realm and long‑term resilience